Final project of restoration and functional recovery of the Arsenal of Venice (Squadratori Hall). The project includes an auditorium on the first floor, limiting the maximum impact. The ground floor is dedicated to reception, cloakroom, services, library and temporary exhibitions space . The recovery of the Bell tower involves an elevator in it, for the removal of architectural barriers.